Home Energy Magazine Online May/June 1999
Handling Framing Details
in High-Performance Homes
by John Tooley
John Tooley is a building science consultant
and senior trainer at Advanced Energy in Raleigh, North Carolina.
This article explains why a high-performance
house can be built only when all the members of the home-building team
work together to create a properly installed sandwich of the thermal and
air barriers. Part 1 concentrated on the designer's role in forming this
sandwich, which I call the continuous contiguous complete (3C) barrier.
Part 2 discusses the framer's role.
 |
| Table 1. Seven Critical Tasks |
| Step |
Responsible Party |
Task |
| 1 |
Designer |
Draw house plans identifying the location of the 3C barrier. |
| 2 |
Builder |
Ensure that the plans are followed. |
| 3 |
Framer |
Follow the plans and establish even planes when possible. |
| 4 |
Mechanical contractors |
Install the rough-in mechanicals. |
| 5 |
Insulation contractor |
Install the vapor retarder on the warm side of the assembly to reduce
vapor diffusion and lower the moisture loads on air conditioning. |
| 6 |
Drywall contractor |
Install gypsum board to continue the plane. |
| 7 |
Insulation contractor |
Follow the air barrier location established by the house plans and
the framer, ensuring that the insulation and the air barrier are in full
contact. |
|
 |
| Shafts on an exterior wall need to be carefully air sealed and capped. |
 |
| There are eight potentially troublesome areas for framers who are
establishing a 3C barrier. (The shaded areas indicate the unconditioned
spaces.) |
1 |
| Before the garage is Sheetrocked, it is easy to see that this floor
system is open to the garage. Without proper sealing, car exhaust and fumes
from stored chemicals can seep directly into the house. |
2 |
| The junction of the floor and garage should be blocked and air sealed
in place. |
3 |
| When a room is cantilevered over an exterior wall, both the floor-and-upper-wall
junction and the floor-and-lower-wall junction should be blocked and air
sealed in place. |
4 |
5 |
| Any corner chase that contains vent pipes must be capped with sheathing
during framing. When the vent is installed, it should be flashed and sealed. |
Standing in the attic, one can look into the chimney chase and down
into the house. When this cavity is heated, the air rises into the attic,
turning the shaft into a chimney for the house's conditioned air. |
|
6 |
| Any shaft that contains a vent must be flashed and air sealed in
this manner. |
7 |
| Soffits to unconditioned spaces also require capping with sheathing. |
8 |
| Often when the insulation is removed, you can see from one side
of the house to the other. When this is the case, the floor space, and
the plumbing pipes, ductwork, and lighting inside the floor, are now in
the attic. They are exposed to the extreme temperatures of the attic. |
The location and installed integrity of the 3C barrier
will dictate the comfort, health, and safety of the home's occupants; the
durability of the structure; and the amount of energy required to heat
and cool the home. A correctly installed 3C barrier starts with the designer.
As I discussed in the first part of this article ("The
High-Performance House--What Does It Take?" HE Mar/Apr '99,
p. 16), designers of houses should specifically and carefully design and
draw the details of the 3C barrier on the elevation page of the house plan
and on the floor plans. The designer should specify the location of the
3C barrier, the materials to be used, and--most important--how those materials
should be joined at breaks in the floor, walls, or ceiling planes.
The builder's job is to ensure that the plan
is followed. This means that the materials specified must be available
at the job site, and that the framer must know the plan and how to achieve
it. Next to plan drawing, the framing of the building is the point where
comfortable and affordable living begins.
The Framer's Road to Success
Creating a high-performance house actually entails
seven tasks, with a different person being responsible for each one (see
Table
1). This article concentrates on the challenges posed by step 3. The
framer's job, to "follow the plans and establish even planes when possible,"
is not an easy one. The framer is the one who begins the process that will
ensure a barrier gets installed in its specified location (see "Back
to the Basics"). All other trades should carefully adhere to the framer's
established planes. They should be trained that whenever they break or
penetrate a plane, they are responsible for sealing and reestablishing
it.
If all houses were a simple box design, the framer
wouldn't have much difficulty. But in most buildings, there are tricky
corners, holes, protrusions, and gaps that must be bridged and properly
sealed. Ceilings adjacent to attics, ceiling intrusions with reference
to (WRT) the attic, exterior walls, floors adjacent to outdoor air, and
shafts, are five general areas where tricky details require special attention.
What follows are some suggestions for how framers can handle those tricky
details.
Ceilings Adjacent to Attics
When establishing the ceiling plane, the framer
should consider the gypsum board or other ceiling surface as the 3C barrier
location. This plane should be kept even and unbroken whenever possible.
Dropped ceilings, chase ways and shafts, chimney cavities, and any other
framing detail that creates a hole or protrusion WRT the attic should be
capped with a sheet product, such as oriented strand board (OSB), plywood,
or high-density cardboard such as Thermo-ply. If wiring, plumbing, venting,
ductwork, or piping penetrates this cap, it should be air sealed with caulk,
foam, or a gasket. This air seal can be established by whichever subcontractor
penetrates the cap or by the insulation prep crew prior to installation
of the insulation.
Whenever 1 x 3 cross furring strips and shims
are used to provide a flat level ceiling base surface, it is best to use
blown insulation to ensure full contact between the insulation and the
Sheetrock. Batted insulation on strapped ceilings often leaves a 3/4-inch
air space between the insulation and the Sheetrock, which creates the perfect
opportunity for air movement.
Ceiling Intrusions WRT the Attic
Wherever a ceiling creates a bump in the plane
of the attic (as is the case with tray and raised ceilings, for example),
the Sheetrock should be the 3C location. Care should be taken to ensure
that the insulation is in full contact with all ceiling surfaces. One special
case of intrusions WRT the attic is canned lights. The builder should be
sure that these fixtures are fire rated (or preferably insulation contact
rated) and that the insulating contractor insulates them properly. Often
canned lights are all treated as though they were not fire rated, and insulation
is unnecessarily placed too far from the light, creating an insulation
void.
Exterior Walls
The 3C location on exterior walls can be either
the exterior sheathing or cladding, or the interior wall surface. In either
case, it should be clearly specified on the house plans. It is good practice
to use the interior cladding as the 3C location in cold climates and the
exterior sheathing as the 3C location in warm climates. In either case,
the objective is to restrict air, heat, and moisture movement at its source,
reducing their entry into the assembly or conditioned space. This practice
will help to reduce air infiltration, hidden condensation, mold growth,
and rot, and to maintain the installed R-value.
Floors Adjacent to Outdoor Air
Of the three planes in a home, floors are the
least broken, because homeowners tend to prefer flat floors. This makes
it easier to create the 3C barrier for the floor plane. When the floor
plane is broken--for example, in the case of a sunken floor--and exposed
to exterior weather conditions, care should be taken to ensure that the
insulation is installed in full contact with the bottom surface of the
subfloor.
Contractors and subs must take particular care
with floors that are above tuck-under garages. The 3C barrier location
can be either the floor sheathing of the room above the garage or the ceiling
surface of the garage itself. If the ceiling surface of the garage is chosen,
the entire floor system should be air sealed to ensure that no air leakage
can occur between the insulation and the room floor sheathing above it.
When the room floor sheathing is chosen and the insulation is installed
in full contact with the sheathing, it is usually not necessary to air
seal the floor cavity.
Shafts Take Special Attention
Shafts appear to be simple for the framer--he
or she just caps them with a sheet product. However, the shaft is one of
the most difficult construction features to handle, because it is usually
not empty. A shaft may contain vents, ductwork, or electrical work. These
items will often penetrate the cap or other places in the shaft. The end
product should be air sealed, any vents penetrating the cap should be flashed
with a noncombustible product (such as sheet metal), and the end should
be air sealed with fire-stop caulk.
Narrowing the Focus
Theory is all well and good, but the real question
is, How does a framer translate these ideas into practice? What follows
are specific instructions on how to deal with problem areas when installing
the 3C barrier.
1 Garage to Basement
Wherever floor joists or trusses are connected
to an attached garage, the floor or framing should be held back enough
to allow room for a rim joist, band, or ribbon to be installed. This framing
detail should be air sealed in place to preclude air movement, which could
carry exhaust from the car or vapors from chemicals stored in the garage,
into the house.
2 Interior Room Partially
Cantilevered Over a Garage
The junction of the floor and garage should be
blocked and air sealed in place. When I joists are used, be sure that the
blocking fills the entire opening between the garage and the floor system.
If this connection is a web truss, an upright 2 x 4 should be engineered
into the truss where the truss crosses the exterior wall, so that the floor
system can be blocked and air sealed.
3 Exterior Cantilever
The junction of the floor and wall should be
blocked and air sealed in place.
4 Corner Chase, 5
Chimney Chase, and 6 Shaft
Corner chases, chimney chases, and shafts must
be capped with sheathing during framing. Once the Sheetrock is installed,
it will create an even plane and establish the location for the 3C barrier.
Not one of these details can be left uncapped, because that would break
the continuity of the 3C barrier.
7 Soffit to Unconditioned
Space
A soffit to unconditioned space can be a dropped
ceiling in the kitchen, added to the design for aesthetics reasons, or
it may contain ductwork running from one side of the building to the other.
These types of soffits create a hole in the attic or a protrusion WRT the
interior of the house, and must be capped with sheathing and insulation.
8 Floors to Sidewall Attic
In many houses, the floor framing is left open
to sidewall attic spaces. Insulation is often placed over the opening.
This practice does little to stop air movement from the floor system into
the adjoining attic. However, it does act as a fine air filter. Heat loss
and air leakage near this connection can cause ice dams, moisture damage
to the roof deck, comfort problems, backdrafting, spillage from combustion
appliances and fireplaces, and, not surprisingly, increased energy use.
To prevent these hazards, fire and draft blocking should be installed and
air sealed in place.
On the Road to Completion
All these examples show how framers and other trades
need to work together to ensure that the 3C barrier really is continuous.
The framer's job, after all, is just step 3 on the path to a high-performance
house. But the contractors can't make their contributions to the installation
of a 3C barrier unless the framer successfully masters the bumps and holes
in the house's planes. With the tricks I've enumerated in a framer's tool
kit, building a high-performance house is just a few steps from completion.
Back to the Basics
Air, Moisture, and Heat Movement
Air moves from high pressure to low pressure,
and it can change direction very quickly. Heat moves from warm areas to
cold ones. Moisture moves from wet areas to drier ones, and from warm areas
to cold ones. Changes in the direction of heat and moisture movement through
solid materials take place very slowly (see Figure 1).
In the winter, we want to keep heated air inside
the building and prevent interior moisture from penetrating the exterior
assemblies. In the summer, we want to keep warm, moist outdoor air out
of the house and its assemblies. Warm, moist air that comes in contact
with cold surfaces can condense, which often results in moisture stains,
damage, mildew, or rot. Insulation needs protection from uncontrolled air
and moisture flow, both of which reduce insulation's ability to resist
heat flow.
Air moves by wind and heat, or fans can drive
it. In order for air and moisture in the vapor state to leak into or out
of a house, there must be holes between the inside and the outside. In
contrast, heat transfer by conduction does not require holes in order to
enter or exit. Conduction loss or gain can cause convection air movement,
but air movement within cavities that are airtight does not necessarily
cause air exchange between the inside of the house and the outdoors.
Convection air flow paths pose a major problem.
Whenever air within a cavity is heated or cooled where the insulation and
air barrier are not continuous or in contact, there is an opportunity for
heating or cooling loss. A cavity can be airtight to the conditioned space
and have a void or gap in the insulation. This creates an air space in
the cavity, which sets convection air flow in motion. Heated or cooled
air will escape if there is an opening in the cavity to the outside. The
escaping air carries with it energy that was intended to either cool or
heat the house.
The air inside the house next to the cavity is
cooled by the convection loop in the cavity and causes it to fall. Often
this results in a comfort complaint, because the homeowner feels that the
house is drafty. In the summer, this cavity would radiate heat to the conditioned
space.
Barrier Location
The location of the air barrier will establish
the location of the vapor retarder and the thermal barrier. In fact, the
products that are used to create the air barrier, such as poly, Styrofoam
blue board, often also form the vapor retarder. The thermal barrier, or
insulation, should be installed in full contact with the air barrier. The
only exception to this rule is when the insulation is installed in an airtight
cavity; then the thermal barrier can be installed in contact with either
side (see Figure 2).
Penetrations in the air barrier enable outside
air, conditioned inside air, and moisture vapor to travel from inside to
outside or vice versa--a process that is known as a thermal bypass. When
this takes place, the entering or exiting air and moisture vapor must pass
through or around the insulation, rendering it less effective. Condensation
may form if moisture vapor comes in contact with any material that is cold.
 |
| Figure 1. Moisture and heat generally travel together. |
 |
| Figure 2. The climate and the location of the air barrier determine
the locations of the vapor and thermal barriers. |
|
| Back to Contents Page |
Home Energy Index |
About
Home Energy |
| Home Energy Home Page
| Back Issues of Home Energy |
Home Energy can be reached at: contact@homeenergy.org
Home Energy magazine -- Please read our Copyright Notice
|