Wisconsin's "Orphan" Solar Program
by Jeff DeLaune, Chip Bircher, and Richard Lane
One utility found that rehabilitating old solar water
heaters amounted to a cost-effective energy conservation program
In July 1993, Wisconsin Public Service (WPS) and
Public Energy Systems (PES) began to evaluate the condition of existing
Solar Domestic Hot Water (SDHW) systems as a precursor to a New Install
Demand-Side Management (DSM) program. Wisconsin's Public Service Commission
had ordered WPS to aggressively market a solar water heater program. WPS
had always allowed SDHW rebates under its "Custom Rebate" program but the
new program would require an inventive and active marketing approach.
WPS reviewed the history of solar installations as background to developing
this new program. An unsettling number of stories described under-trained
contractors installing systems whose components had not undergone sufficient
testing. Most of these contractors went out of business when solar tax
credits ended in 1986. The result was homeowners with systems that failed
and no contractor to contact.
WPS decided it was necessary to analyze these system failures in order
to design a new install program that would not repeat the same problems
and conditions. Unfortunately there has been no coordinated national effort
to collect and disseminate information and "lessons learned"
from earlier programs. PES, formerly Packerland Solar Systems, of Green
Bay, Wisconsin, was contracted to locate and inspect SDHW systems in and
around Green Bay and to collect the necessary information. We named the
program "Orphan Solar" because we expected that these systems
were all but abandoned by original installers and possibly even by their
owners.
In addition, we assumed the installer infrastructure was basically nonexistent.
Customer and intervener groups had pressed WPS for a SDHW "rebate"
program. However, when we first offered one in 1993, this interest was
left unsupported by contractors.
The goals of the program were to
- Determine common causes of system failure and improve the program design
of WPS's new install program to lower the failure rates.
- Determine the condition of system components
after years of use under actual operating conditions in order to better
estimate system life expectancy and energy production.
- Determine customer perceptions and satisfaction with solar heating
equipment.
- Overcome lingering negative perceptions homeowners might have with
the technology.
- Return systems to working condition in order to capture energy savings
for WPS's DSM program.
The last goal was almost an afterthought, and
was included as a way to compensate owners for the inconvenience of the
inspection.
Finding the Orphans
Locating the systems was not as easy as we expected. WPS estimated there
should be approximately 2,000 solar heating systems in its service territory.
However, a survey conducted by WPS meter readers turned up only 178 systems
of all types. A search of WPS's residential audit database located an additional
18 systems. WPS finally resorted to paying PES to manually search through
a paper record of state tax credit recipients to locate installed systems.
PES was able to find over 1,500 additional systems from this list.
Initially the procedure was for PES to mail a postcard explaining the
program to customers before a telephone contact was made. During the phone
call, PES was to determine if the solar system was still installed, if
it was a SDHW system (as opposed to space heating), and if it served as
a preheater for a fuel that WPS provided. An appointment was then made.
During the actual site visit, an inspector explained the program to
the owners, asked a series of demographic and customer satisfaction questions,
and finally conducted a detailed inspection of the SDHW system. Simple
repairs would be performed if possible. More detailed repairs, if needed,
would be made at a second visit.
Almost immediately PES found it difficult to locate the SDHW systems.
Customers, for instance, would report they had a SDHW system and PES would
instead find a solar space heating system. As we later discovered, over
32% of all solar systems are now owned by someone other than the original
purchaser. This forced PES to visit the site of every solar system located
in order find the SDHW systems. This course of action turned out to have
significant positive effects.
 |
|
Figure 1: Schematic of a typical active solar
water heating system
|
Surprising Survey Results
As Table 1 shows, 53 of the solar heating systems inspected were specifically
for domestic water heating, and 89 were for combination water heating/space
heating systems. About 64% of the systems were found to be working. However,
about half of the working systems needed some sort of repair or tune-up.
About 85% of the original purchasers reported they made the investment
in order to save money. Of those with working systems, 91% were satisfied
with their system performance, while 50% of owners of non-working systems
were satisfied!
| Table I: System Demographic Information
|
|   |
DHW
|
DHW/Space Heating |
Number of systems (%)
Average installation date
Average installation cost
Total collector area
Number of collectors
Average azimuth(0°=North)
Average tilt angle
After shading
Number of occupants
Percent of this type working |
53(37%)
1983
$4,945
81 ft2
3
175°
48°
7%
3.8
59.1%
|
89(63%)
1983
$9,675
181 ft2
7
178°
54°
3%
3.6
68.8%
|
Failed Pumps and Controllers
Failures typically consisted of a failed pump or controller. Because
of the nature of SDHW systems as preheaters, a significant number of owners
had no idea if their system was functioning or not. This problem occurred
because installers failed to educate owners on how their system operated
and in the simple observations they could make to ensure it was working
properly. PES quickly found that failed systems could be easily repaired
for only a few hundred dollars. We thus concluded that what had started
as a survey program would be a much more cost-effective DSM program than
a new installation program would be. In fact, the "Orphan" program
was able to supply most of the DSM savings of a new installation program
for 25%-50% of the cost.
WPS projected offering $1,400 rebates for newly installed SDHW systems,
yet the same amount of energy could be captured from an "Orphan" program
for from only $350 to $650 for a complete repair.
It also became evident that the Orphan Solar program did an excellent
job of laying the foundations for a "new installation" program.
Since the installer infrastructure had completely collapsed in Wisconsin,
skills had degenerated, equipment was no longer coming to the state, and
solar's reputation was bad. These were issues WPS wrestled with for its
new install program. The Orphan Solar Program corrected all these problems.
The program retrained people. In fact, PES personnel soon became experts
due to the variety of system designs and components they encountered. The
program also put repair trucks on the road with a complete stock of parts
to handle most existing systems. The Orphan Solar program became everything
we would have expected of a new installation program, except we didn't
have to install new collector panels.
Air-Based Systems are Easier to Repair
In all, 35% of the systems were found to be not working, and another
31% needed some tune-up work. A higher percentage of air-based systems
were operating properly than were liquid-based systems. Air-based systems
heat air and use blowers and ducts to move heat through the system, while
liquid-based systems heat water or an antifreeze solution and use pumps
and pipes to move the heat.
Air-based system failures were also easier and cheaper to repair. Failed
blowers and leaky ducts required less labor to replace and repair than
did failed pumps in a liquid-based system. PES found about 56% of the combination
water/space heating systems were air based. The majority of Wisconsin's
conventional heating systems are forced air, which allows an easier connection
if an air-based solar system is used. Ducting an air-based system into
forced air ductwork requires fewer and cheaper parts than does running
a heat exchanger loop and pump off a water heat storage tank and into the
existing ductwork. However, water heating performance is sacrificed. Most
air-based systems were operating correctly, though in a few instances blowers
or controllers had failed.
The liquid-based systems were mostly active, pressurized, glycol (antifreeze
solution) based systems. These systems rely on the antifreeze to protect
the collectors from freezing up and creating damage at night. Pressure
is needed to keep the air that is inherently mixed in the solution from
coming out of suspension and creating air bubbles. We found that freeze
protection was good, but 56% of the working systems needed to be repressurized.
An alternative to pressurized systems is to use simple water in a "drainback"
system, where each night the water is drained from the collectors into
a holding tank to prevent collector freezing. Drainback systems were found
18% of the time.
Pump failures caused 23% of the system failures for liquid-based systems.
Pump failure is usually caused by pockets of air in systems which lead
to pressure loss. These pumps are self-lubricating and when a large enough
air pocket forms and reaches the pump, it quits circulating fluid, looses
lubrication and eventually burns out. Air pockets are typically caused
by either poor installation practices or leaks in the plumbing.
Air mixes with the circulating fluid when the system is first installed.
An automatic air vent (AAV) should be installed at the highest point in
the system to bleed off this air as it escapes from the fluid during its
first few weeks of alternately heating and cooling. The system is initially
over-pressurized to account for this drop in fluid volume. An expansion
tank is used in the system to handle the normal change in pressure caused
by heating and cooling the fluid.
After a few weeks of operation, the majority of undissolved air has
escaped from the fluid and the AAV should be shut. The correct practice
is for the installer to return to the installation after it has operated
for a few weeks, and isolate the AAV to prevent depressurization. If this
isolation is neglected, high stagnation temperatures cause the fluid in
the collectors to boil out through the vent. This drops fluid volume further
so that, when the system cools down at night, the system pressure drops
to the point that dissolved air can come out of the fluid. This air eventually
collects into an air pocket which moves through the system and ultimately
reaches the pump, interrupts the fluid circulation, and causes the pump
to burn out. This would not occur if the AAV continued to operate properly.
But PES found most AAV's were blocked open by solder flux. PES located
only one system that had developed a leak.
PES found that 21% of the controllers had failed. (Controllers are used
to measure the temperature difference between the collector and the storage
tank, and turn on the pump when energy can be collected.) We believe that
1990s vintage electronics have a longer life than 1980s vintage units and
that this problem will decline in frequency.
Approximately 76% of the systems were roof-mounted and almost all had
storage systems located in a basement. Due to roof mounting, shading of
collectors remains low with 77% having no shading, and average shading
being about 5%.
PES found that 33% of the systems had some sort of previous service
work. About 45% of this service work was to replace failed pumps. Only
a few controllers had been replaced.
To our amazement, 9% of all systems--22% of the SDHW-only systems--had
been disconnected by their owners. PES found that approximately 33% of
the systems are now owned by someone other than the original purchaser.
The new owners did not have a good understanding of how their systems worked,
so they disconnected them. We included these units in the "not-operating"
category, even though no piece of equipment actually failed. These "new"
owners were happy to have someone finally explain how their system worked.
Repairs
Repair work consisted of replacing failed parts. For both failed and
disconnected systems, the system needed to be drained, flushed, and recharged.
The glycol solution turned into sludge after repeated high stagnation temperatures.
While the cost of repair parts averaged only $100, the average repair took
a staggering 28 hours due to the large amount of time needed to flush out
the clogged systems. This flushing consisted of simply continually pumping
clean water through the system in order to force out the sludge that had
accumulated.
Collectors themselves were found to be in good condition. Some yellowing
of glazing had occurred, but there was no noticeable delamination or breakdown
of insulation. About 54% of the collectors were 4' x 8's and the remainder
were a variety of sizes.
Don't Junk that Collector
Solar heating systems have survived well in Wisconsin, and if maintained
correctly, should continue to supply cost-effective energy well into the
future. Air systems require the least amount of repair, while pumps and
controllers cause the most failures in liquid-based systems. In many instances,
this is because the original installers failed to ensure that the systems
maintained charge pressure. Faulty pumps were responsible for 22% of the
"hot water only" system failures and 25% of the combination system failures.
Controllers caused 22% of the hot water only system failures and 50% of
the combination system failures. Nine percent of the systems were shut
off by new owners who did not understand how their systems worked.
Failed systems can usually be quickly put back into service. Some continual
system maintenance is required.
To ensure long-term system performance, take the following precautions
- Install the system correctly. This is not a
trivial chore. Consensus on how this is done for all the different system
types is only now becoming clear.
- Conduct a follow-up visit to ensure proper operation
and to isolate automatic air vents on liquid systems.
- Educate system owners. Knowledgeable owners
can notify service representatives when system charge pressure drops to
zero or pumps and blowers do not operate during sunny days as expected.
These simple measures should allow solar heating systems to produce
long-term energy savings.
Jeff DeLaune is a research and development
consultant in the marketing department of Wisconsin Public Service Corporation
in Green Bay, Wisconsin. Chip Bircher is a demand-side management public
planner with Wisconsin Public Service. Richard Lane is the owner and manager
of Public Energy Systems, also in Green Bay.
Florida's Solar Water Heater Assistance
Program
The U.S. Department of Energy (DOE), the Florida Department of Community
Affairs (DCA), and the Florida Solar Energy Center (FSEC) have teamed up
to install over 1,000 low-cost solar water heating systems in low-income
residences over three years. The $2.3 million pilot program is called the
Solar Weatherization Assistance Program (SWAP).
SWAP's immediate goals are to reduce energy consumption and lower energy
bills for low-income residents while promoting the use of solar water heating.
The long-term goal, however, is to determine the feasibility of including
solar weatherization measures in DOE's national Weatherization Assistance
Program (weatherization).
Towards this end, FSEC will monitor system measures and assess the cost-effectiveness
of the solar water-heating systems used in the program. FSEC will compare
hot water usage and associated energy costs before and after system installations.
Each monitoring period will include one summer and one winter season so
temperature extremes will be represented. This data, with monthly utility
bills, will provide data on energy consumption in low-income households
and the percentage of energy consumption dedicated to heating water.
As a technical matter, DOE approved the use of solar water heaters in
WAP last July. As a practical matter, states that wish to include this
measure as part of their program must have a DOE-approved energy audit
which ranks this procedure and considers its cost-effectiveness with other
weatherization measures to be installed on a dwelling.
Researchers with Oak Ridge National Laboratory, therefore, are working
to add calculations for solar water heating measures to the National Energy
Audit (NEAT). This will allow weatherization agencies to determine if particular
solar water heating measures yield savings-to-investment ratios of one
or greater (see "Computerized Energy Audits,"
HE May/June '94 p.27 and "Measuring the Performance
of the National Energy Audit," p. 35).
Florida's SWAP provided grants to local weatherization agencies to install
simple, reliable, and low-cost solar water heater systems on existing electrical
water heaters. A variety of system types will be used to retrofit conventional
electric tanks for use with solar water heating systems.
Systems currently under consideration for use in the program are manufactured
by American Energy Technology Inc. of Green Cove Springs, FL, Thermal Conversion
Technology of Sarasota, FL, and Solar Development Inc. of Riviera Beach,
FL.
The solar water-heating systems will be "downsized" to accommodate the
existing 40 or 52 gallon electrical water heaters, instead of being installed
with 80 or 120 gallon solar tanks. Downsizing will maximize the number
of systems installed and is expected to reduce the cost to $1,000 to $1,500
per system. During this phase of the pilot program, SWAP anticipates installing
over 500 systems throughout Florida.
For more information contact: Diana Gregory, Florida Department of
Community Affairs, 2740 Centerview Drive, Tallahassee, FL, 32399-2100.
Tel: (904)487-3481.
|
|